Six months at Rust-Belt Manufacturing. The permission system was running. Inventory was live. The approval workflow hadn't broken once. The GM called Oran into his office. "We need a new system for production scheduling. And I want you to lead it — not just the coding. The whole thing. Requirements, design, timeline, rollout." Oran blinked. "That sounds like a project manager's job." "It sounds l